120 transparent prepacked dough rolls enter the TLM packaging line every production minute from the right in five lanes and are picked up by the second and third sub-machines – the first three robot arms – and placed into the infeed chain of a Fuji flowwrapping machine. After packaging into the bags, fully packed Duo puff pastry rolls are collected in the fourth and fifth TLM sub-machine and placed in the shipping carton. In the fifth sub-machine, a box erecting machine, the shipping cartons are erected and then run, from left to right, contrary to the dough rolls. The shipping carton is closed in the first sub-machine, seen from the right. Alternatively, on this line individually packed dough rolls (in printed foil) are also inserted directly into the shipping cartons at a rate of up to 120 rolls per minute. Conversion of the machine from one product/carton format to another is carried out within a few minutes.